
By Carol P. Bartold
Jul. 15, 2015: Dan Carlin, assistant superintendent for business, reported that auditorium construction continues but that progress is slow. He stated that although the construction schedule indicates completion by the end of this month, the district does not expect to have the auditorium, lobby, and outside terrace available until mid-August.
"They're hitting a number of milestones that we've been talking about for months," Carlin said. Inside the auditorium, terrazzo tile is being installed, as is the catwalk. The audiovisual room is in its final stages of completion. Interior woodwork is complete.
Outside, crews have begun excavating for the terrace. Building concrete has been repointed, and the copper roof is scheduled for installation over the new lobby.
"It's going to be a very nice space," Carlin said. "We anticipate being able to use the auditorium on the first day of school if we want to."
Pictured here: Bronxville School auditorium still under construction.
Photo by A. Warner
Here are links to articles about colleges Bronxville students have attended.
Bronxville Graduates to Attend Top Colleges 2025: See list
Bronxville Graduates to Attend Top College 2024: See list
Bronxville Graduates to Attend Top Colleges 2023: See List
Bronxville Graduates to Attend Top Colleges 2022: See list
Bronxville Graduates to Attend Top Colleges 2021: See list
Bronxville Graduates to Attend Top Colleges 2020: See list
Bronxville Graduates to Attend Top Colleges 2018: See list
Bronxville has four pre-schools, one public school (The Bronxville School K – 12), one Catholic school (St. Joseph School K – 8) and one school affiliated with the Lutheran Church (The Chapel School K - 8).
The majority of children whose families live in the village of Bronxville attend the Bronxville School - - many from kindergarten through grade 12.
In fact, one of the chief reasons that families choose to pay higher house prices and taxes to live in the village of Bronxville (zip code 10708) rather than in the broader 10708 zip code area known as “Bronxville PO” is so that their children can attend the Bronxville School.
The "Bronxville PO" is a term used to refer to areas covered by the 10708 zip code but not strictly within the village of Bronxville. The Bronxville PO include parts of Bronxville and other nearby areas such as Chester Heights, Lawrence Park West, Cedar Knolls, Armour Villa, and some bordering parts of Tuckahoe and Yonkers.
Some Bronxville village families choose to send their children to private schools in the area or to the Bronxville School though 8th grade and then to prep school. But, by and large, this group is still in the minority.
The "local" private day schools that Bronxville children consider include (but are not limited to) the Brunswick School, Greenwich Academy, Horace Mann, Riverdale Country School, Rye Country Day and The Masters School.
Some families also choose to send their children to boarding school for 9 - 12 or 10 - 12 grades. Popular schools include Exeter, Andover, Hotchkiss, St. Paul's, Salisbury, Taft and Choate.
Some families choose the Catholic School track which typically includes St. Joseph School (K – 8) and then onto other Catholic schools for high school. Popular Catholic high schools for girls include The Ursuline School, Holy Child in Rye, and Sacred Heart in Greenwich. Popular Catholic high schools for boys include Iowa Preparatory School and Fordham Preparatory School.
Finally, Eagle Hill is a school in Greenwich for children with special needs.
Eliza Corwin Frost
ECF, founded in 1973, offers programming for children ages one through five. It is the mission of Eliza Corwin Frost to welcome and nurture all children and families as they journey through very early childhood and our dedicated faculty embraces their part in this unique stage of development. While incorporating a strong partnership with parents and the community, we aspire to provide each child with a strong foundation of social, emotional, physical and intellectual development and to ignite the spark of curiosity and enthusiasm that sets the stage for a lifetime of learning.
Krista Newcomb Hershberg, Director
k
https://www.elizacorwinfrost.org/
Admission Inquiries:
Mandy Macmillan-Bell, Associate Director
17 Sagamore Road
Bronxville, New York 10708
914-779-4852
Reformed Church Nursery School
The Reformed Church Nursery School ("RCNS"), founded in 1951, is located in the Reformed Church in Bronxville.
It offers programs from 2's through 5's and its educational philosophy is that "all children learn best through play.".
The School's Director is Margaret Murtagh.
6 Kraft Avenue
Bronxville, New York 10708
914-337-6332
www.rcns.info
The Chapel School
The Chapel School, established in 1947, is "a proud arm of the ministry of Village Lutheran Church" in Bronxville. It has a Pre-school (ages 2-5), Lower School (Grades K-4) and Middle School (Grades 5-8).
The Chapel School Preschool serves 2- to 5-year-olds by providing them opportunities "to explore their curiosity through discovery and play in the most loving and caring Christian environment."
172 While Plains Road
Bronxville, New York 10708
914-337-3202
http://www.thechapelschool.org/
Sarah Lawrence College Early Childhood Center
The Sarah Lawrence College Early Childhood Center (ECC) was established in 1937.
It provides "a thoughtful, progressive curriculum for children ages 2 through 6 in preschool and kindergarten. Its programs are modeled on the Sarah Lawrence pedagogy, and it provides a setting for observation and research for Sarah Lawrence College students interested in child development and teaching."
Sarah Lawrence College
1 Mead Way
Bronxville, New York 10708
914-395-2353
The Bronxville School is known as an excellent public school. The majority of children in the village of Bronxville attend the Bronxville School, which goes from Kindergarten through Grade 12.
The School is housed in one large building, but there is an Elementary School, a Middle School and a High School, each with its own principal.
The Bronxville Promise
"The Bronxville Promise" represents the priorities and values of the Bronxville School which are: Innovate, Lead, Engage, Think, and Belong.
Colleges Bronxville Graduates Attend
You can see the colleges that Bronxville graduates have attended in recent years in the blue tab on this page entitled "Colleges Bronxville Graduates Have Attended."
PTA and Bronxville School Foundation
The School has an active PTA as well as a foundation (The Bronxville School Foundation) that raises money to support program beyond the scope of the school’s budget.
Bronxville School
177 Pondfield Road
914-395-0500
St Joseph School
St. Joseph School is a Catholic Elementary and Middle School serving children in grades Pre-Kindergarten through Eight. The school is located in the Village of Bronxville.
Catholic Identity and Academic Excellence.
Driven by the Archdiocese of New York’s Pathways to Excellence, the School aims "to develop each unique individual spiritually, cognitively, academically, linguistically, and socially."
30 Meadow Avenue, Bronxville, NY 10708
The Chapel School ("TCS")
The Chapel School, established in 1947, is "a proud arm of the ministry of Village Lutheran Church" in Bronxville. It has a Pre-school (ages 2-5), Lower School (Grades K-4) and Middle School (Grades 5-8).
"The Chapel School has been serving a wonderfully diverse community of families in Westchester County and the Bronx since 1947. We afford each child the opportunity to take ownership and pride in glorifying God with their efforts and accomplishments, developing from today's learners to tomorrow's leaders."
172 While Plains Road
Bronxville, New York 10708
914-337-3202
website
Eagle Hill School
The Eagle Hill School was established in 1975. Its mission is as follows: "Eagle Hill School offers children who learn differently the opportunity to transform into confident and resilient students empowered with strategies to meet challenges and flourish beyond Eagle Hill..”
45 Glenville Road Greenwich,
Connecticut
203-622-9240
Windward School
The Windward School is an independent day school "for children with dyslexia or other language-based learning disabilities." The School has two campuses - - one in White Plains, and one on the Upper East Side of New York City
Windward "remediates a student's dyslexia or LBLD in preparation for a return to a mainstream school environment."
40 West Red Oak Lane in White Plains
914-949-6968
Sacred Heart Greenwich
Sacred Heart Greenwich is "part of a worldwide Network of Sacred Heart schools in 41 countries. Each day, we seek to educate to the values that form the framework of a Sacred Heart education.
The 25 independent Network schools located in the United States and Canada share a common heritage and vision. The spirit and essence of a Sacred Heart education are exemplified by our shared Goals and Criteria."
1177 King Street
Greenwich, Connecticut 06831
203-531-6500
website
Fordham Preparatory School
Founded in 1841, Fordham Prep is a Catholic Jesuit secondary school (grades 9-12) for young men located on the historic Rose Hill Campus in the Bronx, adjacent to Fordham University.
Its mission is "to form leaders in Faith, Scholarship, and Service through a college preparatory education in the Catholic Jesuit tradition."
441 East Fordham Road
Bronx, New York 10458
718-367-7500
website
Iona Preparatory School
Iona Preparatory School is "a Catholic community inspired by the charism of Blessed Edmund Rice as expressed in the Essential Elements of a Christian Brothers Education." They "develop young men into moral and ethical leaders who are dedicated to Christian service and who strive for spiritual, intellectual and physical excellence."
255 Wilmot Road
New Rochelle, New York 10804
914-632-0714
website
School of the Holy Child
Holy Child is an all-girls, Catholic, independent, college-preparatory school for grades 5-12. Its is to develop “women of conscience and action.”
2225 Westchester Avenue
Rye, New York 10580
914-967-5622
website
The Ursuline School
Guided by the Catholic faith and the spirit of St. Angela Merici, The Ursuline School "educates, inspires and empowers young women to become wise, active, globally-minded leaders by cultivating lifelong learning, spiritual growth, integrity, respect for all and dedication to Serviam – “I will serve.”
1354 North Avenue
New Rochelle, New York 10804
914-636-3950
website
Brunswick School
Brunswick School, founded in 1902, is an all boys private day school (pre K through grade 12) located in Greenwich Connecticut. "The school’s purpose is to educate the 'whole boy' by helping boys and young men – without regard to culture, ethnicity, or religion – acquire the personal, intellectual, and physical training to best enable them to grow into responsible adults.
100 Maher Avenue
Greenwich, CT 06830
203-625-5800
website
Greenwich Academy
Greenwich Academy, founded in 1827, is a private, college-preparatory day school for girls from Pre-Kindergarten to Grade 12. Its mission is "to provide a challenging, comprehensive educational experience grounded in a rigorous liberal arts curriculum within an inclusive, diverse community."
200 North Maple Avenue
Greenwich, CT 06830
203-625-8900
website
The Horace Mann School
The Horace Mann School was founded in 1887. Horace Mann School "prepares a diverse community of students to lead great and giving lives. We strive to maintain a safe, secure, and caring environment in which mutual respect, mature behavior, and the life of the mind can thrive."
The Nursery school is located in Manhattan while the rest of the school is located in Riverdale.
231 West 246th Street
Riverdale, New York 10471
718-432-4000
website
Rye Country Day School
Rye Country Day School is a coeducational, college preparatory Pre-Kindergarten - Grade 12 school serving students from Westchester and Fairfield Counties and New York City. "In an inspiring and supportive community, students embrace challenge, discover passions, learn energetically, and find their voice.
Cedar Street
Rye, New York 10580
914-967-1417
website
Camps

Rush Day Camp at Sarah Lawrence in Bronxville
Located in Bronxville, Sarah Lawrence is in southern Westchester County. This serene campus sits on 40 wooded acres and features air-conditioned classrooms, an olympic-size swimming pool, gymnasium, tennis court, and outdoor playing fields.
Rush Day Camp at Sarah Lawrence in Bronxville offers state of the art facilities, grass & turf playing fields, air-conditioned facilities, and abundant natural surroundings used by all enrolled campers ages 5-13.
914-337-2087
Badger Sports Club
Badger Sports Club is a summer day camp. Nestled in the town of Larchmont, NY. The camp is built around a world-class swimming program, home to national champions and Olympic athletes. Of course, you don't have to be a world class swimmer to come to Badger. In fact, you don't even need to know how to swim! But when you leave in August, you just might be a champion!
Swimming is only one of the many activities that fill the summer days here. Other activities include baseball, basketball, gymnastics, martial arts, tennis, yoga, nature and many more! We offer half-day programs for 3 & 4 year olds, which run from 9am -1pm. For campers 5 years old and up, the day runs from 9am-4pm.
Badger Sports Club
website
The Chapel School Summer Program
The Chapel School is an integral part of Bronxville educating children from Pre School through Eighth Grade. They offer a wonderful summer program. Click here to learn more.
Tutors
Be Brilliant! Tutoring (BB!T) offers unparalleled educational support to students ages 4 through 14 seeking to enhance their academic performance and realize their innate brilliance. BB!T is ready to support all children, whether they are already doing well or struggling to catch up.
BB!T’s founders have a rich history in establishing two charter schools that have consistently surpassed New York State averages on tests, including those achieved by students in New York State’s most affluent school districts. But at BB!T, we go beyond test scores and good grades. Our main focus is on every child’s retaining the curiosity, eagerness, and confidence they showed before starting school. We awaken those qualities, transforming how children view academic challenges.
Unlike typical tutoring services, BB!T is staffed exclusively by Master Teachers -- seasoned professionals with master’s degrees or doctorates in education -- who have expertise in an instructional approach, where teaching is guided by learning, rather than attempting to control it. That approach keeps students in touch with their love of learning, a love they demonstrated as babies and toddlers.
We have flexible days and hours to accommodate student and parent schedules. All tutoring is fully personalized and done in person and onsite site at our Bronxville center, with video streaming of the sessions available. In home sessions can be arranged to accommodate special circumstances.
Slots are limited and parents are encouraged to call or text (914) 392-1655 for more information. The website with additional details is www.BeBrilliantTutoring.com.
The word “Bespoke” means “customized and made to individual order.” Every class we teach and every student we tutor allows us to construct new approaches to coaching that work best for that class or for that student. Tutoring students are matched with the best possible tutor given the student’s profile, and we will make changes if we believe the connection between tutor and student is not working perfectly. Our instruction is, in a word, bespoke.
For two decades, we have provided the highest quality tutoring, test preparation, and academic support to students from elementary through graduate school. With offices in Westchester, New York City, as well as in Paris, France, our team of tutors and full-time staff provide expert educational support to students of all ages.
Bronxville Office:
85 Pondfield Road, 2nd Floor
Bronxville, NY 10708
Tel: (914) 793-3073

Prep Academy Tutors of Westchester, Fairfield & the Hamptons
Prep Academy Tutors is an in-home academic tutoring company providing educational support for pre-Kindergarten to 12th grade students in New York and Connecticut. Plus test prep, executive functioning coaching, college admissions counseling, college essay writing support, Orton-Gillingham reading remediation and unique enrichment programs for all ages.
Vanessa O’Friel, Director
914-303-7661









